Katy Lowe School Farm

Location: Alsager, Cheshire
26/01/2021
Type of building: Cubicle Building
Contract Period: 8 Months

Project Details

This project included the planning and site preparation for a new cubicle building which was to incorporate a Lely Robot system.

Our team worked with the client right from the planning & design stages, and we then undertook site preparation, created a shuttered concrete tank, erected the steel-framed building, laid a concrete floor, installed cubicles, and built blockwork to create tank rooms, and a dairy and robot area.